Deployment registry

Deployments

Every equipment package tracked to a named supplier, the project it serves, the company using it, the MW it covers, the delivery dates and the current deployment stage.

Demo data

Supplier ↔ project ↔ end user (15 packages)

Supplier / scopeProjectUsed by (company)EquipmentQtyMW servedAwardShipOn siteEnergizationStage
Arcline Power Systems · 2 packages
Arcline Power Systems
MV switchgear & e-house power blocks · Houston, US
Lone Star AI Campus
Abilene, Texas, USA · Detailed design
Vantix AI (anchor tenant, 78 MW IT)
Developer Meridian Digital
38 kV arc-resistant line-ups + 10 MW e-house skids10 line-ups100 MW2026-06-012027-07-122027-08-09Q4 2028AWARDED
Arcline Power Systems
MV switchgear · Houston, US
Jurong Liquid-Cooled Node
Jurong, Singapore · Procurement
Straits Compute (own capacity) + undisclosed cloud tenant
Developer Straits Compute
22 kV switchgear line-ups, 2500 A2 line-ups20 MW2026-05-112027-06-212027-08-02Q2 2028IN PRODUCTION
Cryomax Heat Rejection · 2 packages
Cryomax Heat Rejection
Heat rejection plant · Charlotte, US
Lone Star AI Campus
Abilene, Texas, USA · Detailed design
Vantix AI (anchor tenant, 78 MW IT)
Developer Meridian Digital
8 MW modular dry cooler + adiabatic plant8 plants64 MW2027-06-182028-04-072028-05-05Q4 2028TENDER
Cryomax Heat Rejection
Chillers for 30% air-cooled load · Milan, IT
Rheinland AI Cluster
Cologne, Germany · Permitting
Undisclosed EU hyperscaler (LOI, 46 MW IT)
Developer Nordfeld Capital
1000+ TR chillers + dry coolers6 units14 MW2028-03-132029-01-012029-01-22Q3 2029TENDER
Gridforge Substations · 1 package
Gridforge Substations
Modular substation + transformer skids · Gdansk, PL
Rheinland AI Cluster
Cologne, Germany · Permitting
Undisclosed EU hyperscaler (LOI, 46 MW IT)
Developer Nordfeld Capital
40 MVA modular substation, IEC 614392 substations60 MW2027-10-042028-08-212028-09-18Q3 2029TENDER
Helion Rotating Power · 1 package
Helion Rotating Power
Standby generation · Pune, IN
Lone Star AI Campus
Abilene, Texas, USA · Detailed design
Vantix AI (anchor tenant, 78 MW IT)
Developer Meridian Digital
3 MW diesel gensets, EPA Tier 412 units36 MW2027-01-222028-03-172028-05-12Q4 2028TENDER
Modulus Infrastructure · 1 package
Modulus Infrastructure
Prefabricated power + cooling blocks · Johor, MY
Jurong Liquid-Cooled Node
Jurong, Singapore · Procurement
Straits Compute (own capacity) + undisclosed cloud tenant
Developer Straits Compute
5 MW integrated block, DLC + rear-door hybrid4 modules20 MW2026-06-292027-03-222027-04-05Q2 2028AWARDED
Nordpower Transformers · 2 packages
Nordpower Transformers
Main power transformers · Monterrey, MX
Lone Star AI Campus
Abilene, Texas, USA · Detailed design
Vantix AI (anchor tenant, 78 MW IT)
Developer Meridian Digital
150 MVA, 345/34.5 kV ONAN/ONAF3 units100 MW2026-03-162028-09-252028-10-30Q2 2029IN PRODUCTION
Nordpower Transformers
Grid transformers · Vaasa, FI
Rheinland AI Cluster
Cologne, Germany · Permitting
Undisclosed EU hyperscaler (LOI, 46 MW IT)
Developer Nordfeld Capital
40 MVA, 110/20 kV2 units60 MW2026-09-142029-03-262029-04-23Q3 2029TENDER
Not awarded — cooling architecture undefined · 1 package
Not awarded — cooling architecture undefined
Cooling · Data required
Sonoran Mega Campus
Phoenix, Arizona, USA · Early development
Undisclosed hyperscaler — identity unconfirmed
Developer Undisclosed hyperscaler
DLC vs. air not selectedData required300 MWData requiredData requiredData requiredQ3 2030 (target)TENDER
Not awarded — no supplier engaged · 1 package
Not awarded — no supplier engaged
Power train (transformers + switchgear) · Data required
Sonoran Mega Campus
Phoenix, Arizona, USA · Early development
Undisclosed hyperscaler — identity unconfirmed
Developer Undisclosed hyperscaler
Specification undefinedData required300 MWData requiredData requiredData requiredQ3 2030 (target)TENDER
Thermaflux Liquid Cooling · 3 packages
Thermaflux Liquid Cooling
Liquid cooling — CDU, manifolds, QDs · Austin, US
Lone Star AI Campus
Abilene, Texas, USA · Detailed design
Vantix AI (anchor tenant, 78 MW IT)
Developer Meridian Digital
2.5 MW L2L CDU, N+1 pumps (85% DLC scope)24 CDUs + 624 manifold sets66 MW2027-11-052028-03-242028-04-14Q4 2028TENDER
Thermaflux Liquid Cooling
Full DLC liquid cooling · Taoyuan, TW
Jurong Liquid-Cooled Node
Jurong, Singapore · Procurement
Straits Compute (own capacity) + undisclosed cloud tenant
Developer Straits Compute
2.5 MW L2L CDU + cold plates + QDs8 CDUs (N+1)16 MW2026-07-062026-11-232026-12-14Q2 2028IN PRODUCTION
Thermaflux Liquid Cooling
Liquid cooling (70% DLC scope) · Taoyuan, TW
Rheinland AI Cluster
Cologne, Germany · Permitting
Undisclosed EU hyperscaler (LOI, 46 MW IT)
Developer Nordfeld Capital
2.5 MW L2L CDU14 CDUs32 MW2028-08-072028-12-252029-01-29Q3 2029TENDER
Voltbank Energy Storage · 1 package
Voltbank Energy Storage
UPS / BESS ride-through · Ulsan, KR
Jurong Liquid-Cooled Node
Jurong, Singapore · Procurement
Straits Compute (own capacity) + undisclosed cloud tenant
Developer Straits Compute
1.5 MW UPS modules, UL 9540A cells16 modules20 MW2027-01-112027-07-262027-08-23Q2 2028TENDER

Demo dataset, internally reconciled: every supplier exists in the provider database, package lead time equals that supplier's quoted lead time, phase MW sums to campus MW, and award → ship → on-site dates follow the quoted lead time. Nothing here is live market intelligence.

Lone Star AI Campus

Used by
Vantix AI (anchor tenant, 78 MW IT)
Customer type
AI model developer
Workload
GPU training clusters, 132 kW/rack DLC
Offtake
15-year triple-net lease, full campus pre-let
Utility / grid
Oncor — 345 kV interconnection, queue position confirmed
Substation
3 × 150 MVA (450 MVA installed)
EPC
Meridian Build Group (self-perform) + Arcline power packages
Campus / IT
100 / 78 MW
PhaseMWEnergizationStage
Phase 140 MWQ4 2028Detailed design
Phase 235 MWQ2 2029Design
Phase 325 MWQ4 2029Concept
Total100 MW5 supplier packages tracked
SOURCE Utility interconnection filing + developer briefingLEVEL B · Primary publicLAST VERIFIED 2026-07-30HIGH

Jurong Liquid-Cooled Node

Used by
Straits Compute (own capacity) + undisclosed cloud tenant
Customer type
Regional cloud / inference operator
Workload
Inference + fine-tuning, 100 kW/rack full DLC
Offtake
60% self-use, 40% contracted colocation
Utility / grid
SP PowerGrid — 66 kV, allocation under IMDA DC-CFA
Substation
2 × 20 MVA (40 MVA installed)
EPC
Kajima Overseas Asia (main contractor)
Campus / IT
20 / 16 MW
PhaseMWEnergizationStage
Phase 110 MWQ2 2028Procurement
Phase 210 MWQ4 2028Detailed design
Total20 MW4 supplier packages tracked
SOURCE Client project briefLEVEL A · Verified directLAST VERIFIED 2026-08-03VERY HIGH

Rheinland AI Cluster

Used by
Undisclosed EU hyperscaler (LOI, 46 MW IT)
Customer type
Hyperscale cloud
Workload
Mixed training + enterprise cloud, 80 kW/rack
Offtake
Letter of intent — lease not executed
Utility / grid
Amprion / Westnetz — 110 kV, connection study in progress
Substation
2 × 40 MVA (80 MVA planned)
EPC
Not awarded — EPC tender Q1 2027
Campus / IT
60 / 46 MW
PhaseMWEnergizationStage
Phase 124 MWQ3 2029Permitting
Phase 236 MWQ1 2030Concept
Total60 MW4 supplier packages tracked
SOURCE Government filing + local pressLEVEL B · Primary publicLAST VERIFIED 2026-06-25MEDIUM

Sonoran Mega Campus

Used by
Undisclosed hyperscaler — identity unconfirmed
Customer type
Hyperscale cloud (assumed)
Workload
Data required — cooling architecture undefined
Offtake
Data required
Utility / grid
APS — 500 kV study; on-site generation under evaluation
Substation
Data required
EPC
Not appointed
Campus / IT
300 / 240 MW
PhaseMWEnergizationStage
Phase 1100 MWQ3 2030Early development
Phase 2100 MWQ1 2031Early development
Phase 3100 MWData requiredLand only
Total300 MW2 supplier packages tracked
SOURCE Land purchase recordLEVEL B · Primary publicLAST VERIFIED 2026-08-01MEDIUM