Modular solutions intelligence

Modular Solutions

Parallel factory and site construction is the single largest schedule lever available. Intel Accelerator evaluates whether a project should be modularized, at what block size, and who can build the blocks.

Demo data

Provider comparison

ProviderModule typeCapacityRack densityLead timePrice range
Modulus Infrastructure
Dallas US, Rotterdam NL, Johor MY
Integrated power + cooling block5 MW132 kW/rack38wCONSTRAINEDUSD 4.1–4.9M / module
Arcline Power Systems
Houston US, Reynosa MX
E-house / MV power skid10 MWn/a30wCONSTRAINEDUSD 2.6–3.2M / skid
Thermaflux Liquid Cooling
Austin US, Taoyuan TW
CDU skid (2.5 MW)2.5 MW160 kW/rack20wNORMALUSD 380–520k / skid
Gridforge Substations
Gdansk PL, Dammam SA
Modular substation + transformer skid40 MVAn/a46wCONSTRAINEDDATA REQUIRED
Cryomax Heat Rejection
Charlotte US, Milan IT
Modular heat rejection plant8 MWn/a34wCONSTRAINEDUSD 1.8–2.4M / plant

Module categories tracked

  • Prefabricated data center modules
  • Prefabricated electrical modules
  • Power skids
  • Power rooms
  • E-houses
  • Modular substations
  • Transformer skids
  • MV skids
  • LV skids
  • UPS modules
  • Generator modules
  • BESS modules
  • Cooling skids
  • CDU skids
  • Pump skids
  • Heat exchanger skids
  • Chiller modules
  • Dry cooler modules
  • Liquid cooling modules
  • DLC distribution modules
  • Rack modules
  • Network modules
  • Containerized infrastructure
  • Prefabricated MEP modules
  • Integrated power + cooling modules

NEURA modularization score — Lone Star AI Campus

78High potential
Benefits
  • Parallel factory / site construction
  • Reduced field labour in a tight market
  • Factory QA and pre-commissioning
  • Repeatable 10 MW electrical blocks
  • Phased energization from block 1
Risks
  • Transport envelope for 10 MW e-house
  • Local code acceptance of factory-built assemblies
  • Single-factory concentration risk
  • Crane / heavy-lift window availability

Provenance

  • Modulus Infrastructure
    SOURCE Supplier submittedLEVEL D · Market intelligenceLAST VERIFIED 2026-06-19MEDIUM
  • Arcline Power Systems
    SOURCE Manufacturer quotationLEVEL A · Verified directLAST VERIFIED 2026-08-04VERY HIGH
  • Thermaflux Liquid Cooling
    SOURCE Supplier confirmationLEVEL A · Verified directLAST VERIFIED 2026-08-05VERY HIGH
  • Gridforge Substations
    SOURCE Broker informationLEVEL D · Market intelligenceLAST VERIFIED 2026-02-17UNVERIFIED
  • Cryomax Heat Rejection
    SOURCE Analyst researchLEVEL C · High-quality secondaryLAST VERIFIED 2026-05-21MEDIUM

Supplier-submitted data is never automatically promoted to NEURA VERIFIED.