Intel Accelerator
INTEL ACCELERATOR
SERVICES

Services marketplace & bookings

Equipment is only half of delivery. Book the engineering, testing, installation and commissioning that turn hardware into an operating module.

Demo data

PROFESSIONAL SERVICES — SCOPE, PRICE AND HOW TO START

Building your module, matching products, seeing basic risk and browsing suppliers stays free. These are the services you can buy when you want us to do the work. Every price here has a way to start it — fixed-price work can be ordered online, and anything whose scope genuinely varies is agreed by proposal.

MODULE CONFIGURATION

We configure your module end to end and hand back a preliminary BOM you can source against.

NOT PURCHASED
USD $6,000
  • ·Technical module configuration
  • ·Preliminary bill of materials
  • ·Product matching per package
  • ·Lead-time review
  • ·RFS risk analysis
TURNAROUND
3–5 business days
DELIVERY
Configuration pack (PDF)

ENGINEERING REVIEW

An engineer reviews your configuration, challenges the assumptions and returns an updated module.

NOT PURCHASED
USD $9,000
  • ·Engineer review of the configuration
  • ·Technical assumptions review
  • ·Compatibility review (electrical, hydraulic, controls)
  • ·Deviation review against the compute platform reference
  • ·Updated module returned to your project
TURNAROUND
5–10 business days
DELIVERY
Review report (PDF)

RFP EXECUTIVE REVIEW

We read your RFP set, extract the requirements and return a compliance and gap position.

NOT PURCHASED
USD $2,500
  • ·Requirement extraction from your uploaded documents
  • ·Compliance matrix
  • ·Missing information register
  • ·Conflict detection between documents
  • ·RFS protection position
TURNAROUND
2–4 business days
DELIVERY
Executive review (PDF)

EXECUTIVE MODULE REPORT

Branded, client-ready report of your configured module, generated immediately after payment.

NOT PURCHASED
USD $1,500
  • ·Module summary and KPIs
  • ·Package-by-package configuration
  • ·Pricing coverage and confidence
  • ·Schedule and RFS view
  • ·Assumptions with sources
TURNAROUND
Immediate
DELIVERY
Branded PDF, downloadable immediately

TECHNICAL COMPATIBILITY REVIEW

Interface-level check across the selected products before you commit to a PO.

NOT PURCHASED
USD $3,500
  • ·Electrical interface check
  • ·Hydraulic interface and flow check
  • ·Controls and monitoring interface check
  • ·Mechanical and footprint check
  • ·Substitution impact list
TURNAROUND
3–5 business days
DELIVERY
Compatibility matrix (PDF)

SUPPLIER SHORTLIST

Primary, secondary and backup supplier per package, with the reason each one qualified.

NOT PURCHASED
USD $1,800
  • ·Package-by-package shortlist
  • ·Primary / secondary / backup assignment
  • ·Region and compliance filtering
  • ·Concentration risk note
TURNAROUND
2–3 business days
DELIVERY
Shortlist pack (PDF)

MANAGED SOURCING

We run the RFQ cycle for you: issue, chase, normalise and compare technically and commercially.

NOT PURCHASED
From USD $9,000
  • ·RFQ generation and distribution
  • ·Supplier follow-up
  • ·Technical comparison
  • ·Schedule comparison
  • ·Commercial comparison
TURNAROUND
2–4 weeks depending on package count
DELIVERY
Normalised quote comparison

PRIORITY PRODUCT SOURCING

One critical package sourced fast when a lead time is threatening your RFS.

NOT PURCHASED
USD $4,500
  • ·Single package RFQ cycle
  • ·Alternative and drop-in substitution search
  • ·Factory slot enquiry
  • ·Expedited response chasing
TURNAROUND
5–10 business days
DELIVERY
Quote comparison

PROCUREMENT MANAGEMENT

Full multi-vendor procurement management through to delivery for a complete module.

NOT PURCHASED
Typically 1.5–3% of equipment value, or custom commercial terms
  • ·All packages sourced and managed
  • ·Supplier performance tracking
  • ·Expediting and slot protection
  • ·Submittal and documentation control
  • ·Delivery coordination
TURNAROUND
Programme length, agreed at award
DELIVERY
Managed programme with reporting cadence

Scope varies on this service, so it is agreed commercially before any charge.

SITE ASSESSMENT

Site visit and readiness assessment against the configured module.

NOT PURCHASED
From USD $12,000
  • ·Electrical readiness
  • ·Piping and mechanical readiness
  • ·Access, laydown and rigging review
  • ·Constraint register
TURNAROUND
Scheduled after project review
DELIVERY
Site assessment report (PDF) with photographs

TCS DESIGN REVIEW

Full review of the liquid cooling loop from heat rejection to the cold plate.

NOT PURCHASED
USD $7,500
  • ·Flow and ΔT verification
  • ·Pressure drop budget review
  • ·Material compatibility review
  • ·CDU sizing and redundancy check
  • ·Coolant and water quality position
TURNAROUND
5–10 business days
DELIVERY
TCS review report (PDF)

COMMISSIONING PROGRAMME

Level 1–5 commissioning management for the module, scoped against your equipment list.

NOT PURCHASED
Request proposal
  • ·Commissioning plan
  • ·OEM start-up coordination
  • ·TCS and controls commissioning
  • ·Integrated systems testing
  • ·Handover documentation
TURNAROUND
Scheduled against your RFS
DELIVERY
Commissioning programme and reporting

Scope varies on this service, so it is agreed commercially before any charge.

EXPEDITING

Ongoing factory expediting on the packages that control your date.

NOT PURCHASED
From USD $3,000
  • ·Monthly factory status calls
  • ·Milestone and slot verification
  • ·Slip early warning
  • ·Recovery option proposals
TURNAROUND
Starts within 5 business days
DELIVERY
Monthly expediting report

Service categories

EngineeringMEP designInstallationPipingElectrical installationControls integrationCommissioningFAT witnessLogisticsMaintenanceCoolant testingWater treatment

Book FAT

Supplier B · Factory: EU plant · Product: CDU 1.5 MW × 4
Required documents
  • · Approved GA drawing
  • · Test procedure
  • · Instrument calibration certificates
  • · Factory QA plan
  • · Punch-list template

Book site readiness review

An engineer reviews the site against the commissioning prerequisites for your equipment package.

Book commissioning

Recommended spares — 2-year package

CDU pump cartridge2Critical rotating spare
Filter set (2-year)24Consumable
Quick disconnect pairs20Field damage allowance
Coolant top-up (PG25)400Litres
Pressure / temperature sensors8Instrumentation spares
Control PLC module1Long-lead electronic spare

Source spare / backup unit

CDUPumpsQuick disconnectsControls / PLCFansFiltersValves

Add maintenance

INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.