TECHNOLOGY COOLING SYSTEM
TCS / Direct liquid cooling loop
The liquid cooling loop is a system, not a collection of CDUs. Configure the full chain from heat rejection to the GPU cold plate, check hydraulics and materials, then source the complete loop as one package.
LIQUID LOAD
9.0MW
REQUIRED FLOW
13,617L/min
ESTIMATED SYSTEM VOLUME
86,798L
TCS LOOP COMPLETENESS
0%
LOOP BRIEF — ENGINEERING INPUTS
ENGINEERING CALCULATIONFlow derived from load, specific heat and ΔT using PG25 (25% propylene glycol) (cp 3.85 kJ/kg·K, density 1030 kg/m³). Common DLC secondary-loop fluid with inhibitor package. Every value is an engineer-overridable assumption, not a final design.
TCS LOOP — CLICKABLE ARCHITECTURE
01 · Primary
Heat rejection
NOT SELECTED
02 · Primary
Primary loop piping
NOT SELECTED
03 · Primary
Primary pumps
NOT SELECTED
04 · Primary
Strainer / filtration
NOT SELECTED
05 · Exchange
Heat exchanger / CDU
NOT SELECTED
06 · Secondary
Secondary pumps
NOT SELECTED
07 · Secondary
Secondary supply header
NOT SELECTED
08 · Secondary
Control / balancing valves
NOT SELECTED
09 · Secondary
Row manifold
NOT SELECTED
10 · Rack
Rack manifold
NOT SELECTED
11 · Rack
Hose / flexible connection
NOT SELECTED
12 · Rack
Quick disconnect
NOT SELECTED
13 · Rack
Cold plate
NOT SELECTED
14 · Rack
GPU / CPU
NOT SELECTED
15 · Rack
Return manifold
NOT SELECTED
16 · Secondary
Secondary return header
NOT SELECTED
17 · Exchange
CDU return
NOT SELECTED
18 · Primary
Primary return
NOT SELECTED
19 · Primary
Heat rejection
NOT SELECTED
SYSTEM SUPPORT — NOT IN THE SERIAL CHAIN, STILL REQUIRED
TCS LOOP COMPLETENESS
0%
0 of 20 required loop categories selected.
- · Coolant selected
- · QD interface not confirmed
- · Pipe material not selected
- · Filter micron rating missing
- · Expansion tank not sized
- · Heat rejection not selected
- · Primary pump not selected
- · Secondary pump not selected
- · CDU not selected
- · Plate heat exchanger not selected
- · Strainer not selected
- · Filtration not selected
HYDRAULIC MATCH
Total thermal load9.00 MW liquid
Required flow13,617 L/min
Selected CDU flowCDU not selected
CDU quantity5 × 2.5 MW (N+1)
Preliminary header sizeDN400 — PRELIMINARY PIPE SIZE
Preliminary branch sizeDN150 — PRELIMINARY PIPE SIZE
System pressure drop0 kPa partial — missing: Pipe / header, Control valve, Strainer / filter, Heat exchanger, Manifold, Hose, Quick disconnect, Cold plate
ENGINEERING REVIEW REQUIRED — hydraulic validation is not complete while any element has no published pressure drop.
PRESSURE DROP BUDGET
| ELEMENT | ALLOWANCE | BASIS |
|---|---|---|
| Pipe / header | SELECT PRODUCT | Indicative allowance for header and branch runs. |
| Control valve | SELECT PRODUCT | Typical authority allowance for a PICV. |
| Strainer / filter | SELECT PRODUCT | Clean-element allowance; rises with loading. |
| Heat exchanger | SELECT PRODUCT | Secondary-side allowance. |
| Manifold | SELECT PRODUCT | Row and rack manifold combined allowance. |
| Hose | SELECT PRODUCT | Flexible connection allowance. |
| Quick disconnect | SELECT PRODUCT | Supply and return QD pair. |
| Cold plate | SELECT PRODUCT | Dominant secondary-loop resistance. |
ESTIMATED SYSTEM VOLUME
Header volume
54,470 L
Branch volume
18,157 L
CDU volume
1,250 L
Manifold volume
960 L
Hose volume
640 L
Fill margin (15%)
11,321 L
Geometry-based estimate. CDU internal volume assumed at 250 L per unit, rack manifold 12 L, hose set 8 L per rack. Replace with manufacturer volumes once products are selected.
MATERIAL COMPATIBILITY CHECK
Copper
COMPATIBLE BASED ON SOURCE
Nickel-plated copper
COMPATIBLE BASED ON SOURCE
Stainless steel 316L
COMPATIBLE BASED ON SOURCE
Brass
REVIEW REQUIRED
Aluminium
REVIEW REQUIRED
Carbon steel
REVIEW REQUIRED
EPDM
COMPATIBLE BASED ON SOURCE
FKM
COMPATIBLE BASED ON SOURCE
NBR
REVIEW REQUIRED
PTFE
COMPATIBLE BASED ON SOURCE
PP-R / PP-RCT
REVIEW REQUIRED
PEX
REVIEW REQUIRED
CPVC
REVIEW REQUIRED
HDPE
REVIEW REQUIRED
Checked against PG25 (25% propylene glycol). Compatibility is indicative — confirm against the coolant and component datasheets before release for construction.
TCS LOOP BOM
| ITEM | QUANTITY | BASIS / ASSUMPTION | SELECTION |
|---|---|---|---|
| CDU | 5 | 2.5 MW units at N+1 | SELECT |
| Secondary pumps | 10 | 2 per CDU (N+1) | SELECT |
| Primary pumps | 6 | Facility loop duty + standby | SELECT |
| Plate heat exchanger | 5 | Where CDU is heat-exchanger only | SELECT |
| Supply header DN400 | 240 m | Velocity target 2 m/s | SELECT |
| Return header DN400 | 240 m | Mirror of supply route | SELECT |
| Branch piping DN150 | 640 m | 8 rows | SELECT |
| Row manifolds | 8 | One per row | SELECT |
| Rack manifolds | 80 | One per liquid-cooled rack | SELECT |
| Quick disconnect pairs | 160 | Assumption: 2 pairs per rack — confirm per server architecture | SELECT |
| Flexible hoses | 320 | Assumption: 4 per rack (supply/return, redundant) | SELECT |
| Control / balancing valves | 26 | Row branches plus CDU primary control | SELECT |
| Isolation / check / drain valves | 88 | Isolation at every row and CDU, with drains and vents | SELECT |
| Strainers | 10 | Primary and secondary side per CDU | SELECT |
| Side-stream filtration skid | 3 | Assumption: one skid per two CDUs | SELECT |
| Air separator / degasser | 5 | One per secondary loop | SELECT |
| Expansion / pressurisation set | 5 | Sized against 86798 L estimated volume | SELECT |
| Sensors (flow, pressure, dP, temperature, leak, quality) | 178 | Row, CDU and rack instrumentation | SELECT |
| Fittings, couplings, supports and insulation | Per piping route | Quantified at detailed design | SELECT |
| Coolant — PG25 (25% propylene glycol) | 86798 L | Estimated system volume including 15% fill margin | SELECT |
| Fill / flush cart | 1 | Commissioning and service | SELECT |
TCS CRITICAL PATH
Heat rejectionNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Primary pumpNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Secondary pumpNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
CDUNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Plate heat exchangerNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
StrainerNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
FiltrationNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Air separation / degassingNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Expansion & pressurisationNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Control & balancing valvesNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Isolation, check & drain valvesNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Instrumentation & leak detectionNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
ManifoldsNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Distribution headersNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Hose / flexible connectionNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Quick disconnectNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Cold plateNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
PipingNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Fittings & couplingsNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
CoolantNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Small components control readiness as often as the CDU. Quick disconnects, control valves, hoses, filters and fittings are tracked on the critical path — when a QD is the longest item the loop is flagged QUICK DISCONNECT IS CONTROLLING LIQUID-COOLING READINESS.
RFP → TCS LOOP MAPPING
Pipe material
Detects: ss316, 316l, stainless, carbon steel, pp-r
Pipe size
Detects: dn, nps, pipe size, diameter
Flow
Detects: lpm, l/min, gpm, m3/h, flow rate
Pressure
Detects: bar, kpa, psi, design pressure, working pressure
Delta T
Detects: delta t, δt, approach, supply temperature, return temperature
Coolant
Detects: pg25, pg 25, propylene glycol, glycol, treated water
Filtration
Detects: micron, filtration, strainer, side stream, particle count
Valve type
Detects: picv, balancing valve, control valve, butterfly, kvs
Manifold
Detects: manifold, header, branch
QD
Detects: uqd, nvqd, quick disconnect, dripless, blind mate
Hose
Detects: hose, flexible connection, braided, epdm
Expansion tank
Detects: expansion, pressurisation, pressurization, buffer tank, make-up
Water treatment
Detects: water treatment, chemistry, inhibitor, biocide, conductivity
Leak detection
Detects: leak detection, leak sensor, tracetek, seahawk
Controls
Detects: bacnet, modbus, bms, sequence of operation
TCS COMMISSIONING
- 01Pressure testHydrostatic test of primary and secondary loops at design test pressure.
- 02Leak testHeld-pressure leak test across every joint, manifold and QD before energisation.
- 03FlushingHigh-velocity flush of headers and branches; new piping is never assumed clean.
- 04CleaningChemical clean where the pipe material and coolant programme require it.
- 05Filter replacementChange flush elements to service elements after cleanliness acceptance.
- 06Air removalDegassing and venting until stable dP and pump readings.
- 07Coolant fillFill with the specified fluid via the fill cart, recording batch and volume.
- 08Coolant concentration testVerify glycol concentration and inhibitor level against datasheet.
- 09Water-quality testConductivity, pH, hardness and particle count against the cold-plate spec.
- 10Pump rotationDirection, current draw and VFD parameter verification.
- 11Flow balancingBalance rows and racks against design flow per rack.
- 12Valve commissioningStroke, authority, fail position and signal verification.
- 13Controls testingSequence of operation, setpoints, alarms and failover.
- 14Leak detection testSimulate leak at rack and CDU; confirm alarm and isolation response.
- 15BMS integrationPoint-to-point verification of BACnet / Modbus objects.
- 16Thermal load testLoad-bank or live-load verification of approach temperature and ΔT.
SYSTEM CLEANLINESS
- Initial flushRecord flush velocity, duration and discharge condition.
- Filter changesLog every element change with differential pressure at change-out.
- Particle levelParticle count against the cold-plate manufacturer limit.
- Water qualityConductivity, pH, chloride and hardness results.
- Coolant qualityConcentration, inhibitor level and biological control.
- Final acceptanceCleanliness certificate issued before GPU load is applied.
New piping is never treated as clean. Cleanliness acceptance is required before GPU load is applied.
TCS SERVICE PROVIDERS
Piping contractor
Header and branch installation, joining, supports, testing.
Mechanical contractor
Plant room, CDU setting, pumps, heat rejection tie-in.
Liquid cooling installer
Manifolds, hoses, QDs and rack-level interface.
Controls integrator
BMS/EPMS integration, sequences, alarms, leak response.
Flushing contractor
Flushing, cleaning and cleanliness certification.
Water treatment provider
Chemistry programme, dosing and monitoring.
Commissioning agent
Cx plan, witnessing, documentation and handover.
Coolant supplier
Fluid supply, batch documentation and top-up.
Coolant testing laboratory
Periodic sample analysis and trend reporting.
Maintenance provider
Planned maintenance, filter service, leak response.
TCS PACKAGE COMMERCIAL MODEL
ALL TCS COMPONENT CATEGORIES
Heat rejection
Heat rejection
6 providers mapped
Primary loop
Primary pump
9 providers mapped
Secondary loop
Secondary pump
5 providers mapped
Heat exchange
CDU
8 providers mapped
Heat exchange
Plate heat exchanger
8 providers mapped
Filtration
Strainer
5 providers mapped
Filtration
Filtration
6 providers mapped
Air & pressure
Air separation / degassing
5 providers mapped
Air & pressure
Expansion & pressurisation
6 providers mapped
Instrumentation & controls
Control & balancing valves
12 providers mapped
Instrumentation & controls
Isolation, check & drain valves
6 providers mapped
Instrumentation & controls
Instrumentation & leak detection
10 providers mapped
Distribution
Manifolds
8 providers mapped
Distribution
Distribution headers
4 providers mapped
Rack interface
Hose / flexible connection
6 providers mapped
Rack interface
Quick disconnect
7 providers mapped
Rack interface
Cold plate
7 providers mapped
Piping
Piping
14 providers mapped
Fittings
Fittings & couplings
8 providers mapped
Coolant
Coolant
10 providers mapped
Coolant
Coolant treatment & testing
4 providers mapped
Service equipment
Fill, flush & service equipment
4 providers mapped