Intel Accelerator
INTEL ACCELERATOR
TECHNOLOGY COOLING SYSTEM

TCS / Direct liquid cooling loop

The liquid cooling loop is a system, not a collection of CDUs. Configure the full chain from heat rejection to the GPU cold plate, check hydraulics and materials, then source the complete loop as one package.

LIQUID LOAD
9.0MW
REQUIRED FLOW
13,617L/min
ESTIMATED SYSTEM VOLUME
86,798L
TCS LOOP COMPLETENESS
0%

LOOP BRIEF — ENGINEERING INPUTS

ENGINEERING CALCULATIONFlow derived from load, specific heat and ΔT using PG25 (25% propylene glycol) (cp 3.85 kJ/kg·K, density 1030 kg/m³). Common DLC secondary-loop fluid with inhibitor package. Every value is an engineer-overridable assumption, not a final design.

TCS LOOP — CLICKABLE ARCHITECTURE

TCS LOOP COMPLETENESS

0%
0 of 20 required loop categories selected.
  • · Coolant selected
  • · QD interface not confirmed
  • · Pipe material not selected
  • · Filter micron rating missing
  • · Expansion tank not sized
  • · Heat rejection not selected
  • · Primary pump not selected
  • · Secondary pump not selected
  • · CDU not selected
  • · Plate heat exchanger not selected
  • · Strainer not selected
  • · Filtration not selected

HYDRAULIC MATCH

Total thermal load9.00 MW liquid
Required flow13,617 L/min
Selected CDU flowCDU not selected
CDU quantity5 × 2.5 MW (N+1)
Preliminary header sizeDN400 — PRELIMINARY PIPE SIZE
Preliminary branch sizeDN150 — PRELIMINARY PIPE SIZE
System pressure drop0 kPa partial — missing: Pipe / header, Control valve, Strainer / filter, Heat exchanger, Manifold, Hose, Quick disconnect, Cold plate
ENGINEERING REVIEW REQUIRED — hydraulic validation is not complete while any element has no published pressure drop.

PRESSURE DROP BUDGET

ELEMENTALLOWANCEBASIS
Pipe / headerSELECT PRODUCTIndicative allowance for header and branch runs.
Control valveSELECT PRODUCTTypical authority allowance for a PICV.
Strainer / filterSELECT PRODUCTClean-element allowance; rises with loading.
Heat exchangerSELECT PRODUCTSecondary-side allowance.
ManifoldSELECT PRODUCTRow and rack manifold combined allowance.
HoseSELECT PRODUCTFlexible connection allowance.
Quick disconnectSELECT PRODUCTSupply and return QD pair.
Cold plateSELECT PRODUCTDominant secondary-loop resistance.

ESTIMATED SYSTEM VOLUME

Header volume
54,470 L
Branch volume
18,157 L
CDU volume
1,250 L
Manifold volume
960 L
Hose volume
640 L
Fill margin (15%)
11,321 L
Geometry-based estimate. CDU internal volume assumed at 250 L per unit, rack manifold 12 L, hose set 8 L per rack. Replace with manufacturer volumes once products are selected.

MATERIAL COMPATIBILITY CHECK

Copper
COMPATIBLE BASED ON SOURCE
Nickel-plated copper
COMPATIBLE BASED ON SOURCE
Stainless steel 316L
COMPATIBLE BASED ON SOURCE
Brass
REVIEW REQUIRED
Aluminium
REVIEW REQUIRED
Carbon steel
REVIEW REQUIRED
EPDM
COMPATIBLE BASED ON SOURCE
FKM
COMPATIBLE BASED ON SOURCE
NBR
REVIEW REQUIRED
PTFE
COMPATIBLE BASED ON SOURCE
PP-R / PP-RCT
REVIEW REQUIRED
PEX
REVIEW REQUIRED
CPVC
REVIEW REQUIRED
HDPE
REVIEW REQUIRED
Checked against PG25 (25% propylene glycol). Compatibility is indicative — confirm against the coolant and component datasheets before release for construction.

TCS LOOP BOM

ITEMQUANTITYBASIS / ASSUMPTIONSELECTION
CDU52.5 MW units at N+1SELECT
Secondary pumps102 per CDU (N+1)SELECT
Primary pumps6Facility loop duty + standbySELECT
Plate heat exchanger5Where CDU is heat-exchanger onlySELECT
Supply header DN400240 mVelocity target 2 m/sSELECT
Return header DN400240 mMirror of supply routeSELECT
Branch piping DN150640 m8 rowsSELECT
Row manifolds8One per rowSELECT
Rack manifolds80One per liquid-cooled rackSELECT
Quick disconnect pairs160Assumption: 2 pairs per rack — confirm per server architectureSELECT
Flexible hoses320Assumption: 4 per rack (supply/return, redundant)SELECT
Control / balancing valves26Row branches plus CDU primary controlSELECT
Isolation / check / drain valves88Isolation at every row and CDU, with drains and ventsSELECT
Strainers10Primary and secondary side per CDUSELECT
Side-stream filtration skid3Assumption: one skid per two CDUsSELECT
Air separator / degasser5One per secondary loopSELECT
Expansion / pressurisation set5Sized against 86798 L estimated volumeSELECT
Sensors (flow, pressure, dP, temperature, leak, quality)178Row, CDU and rack instrumentationSELECT
Fittings, couplings, supports and insulationPer piping routeQuantified at detailed designSELECT
Coolant — PG25 (25% propylene glycol)86798 LEstimated system volume including 15% fill marginSELECT
Fill / flush cart1Commissioning and serviceSELECT

TCS CRITICAL PATH

Heat rejectionNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Primary pumpNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Secondary pumpNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
CDUNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Plate heat exchangerNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
StrainerNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
FiltrationNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Air separation / degassingNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Expansion & pressurisationNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Control & balancing valvesNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Isolation, check & drain valvesNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Instrumentation & leak detectionNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
ManifoldsNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Distribution headersNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Hose / flexible connectionNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Quick disconnectNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Cold plateNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
PipingNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Fittings & couplingsNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
CoolantNo product selected · LEAD TIME — REQUEST CURRENT QUOTE
Small components control readiness as often as the CDU. Quick disconnects, control valves, hoses, filters and fittings are tracked on the critical path — when a QD is the longest item the loop is flagged QUICK DISCONNECT IS CONTROLLING LIQUID-COOLING READINESS.

RFP → TCS LOOP MAPPING

TCS COMMISSIONING

  1. 01Pressure test
    Hydrostatic test of primary and secondary loops at design test pressure.
  2. 02Leak test
    Held-pressure leak test across every joint, manifold and QD before energisation.
  3. 03Flushing
    High-velocity flush of headers and branches; new piping is never assumed clean.
  4. 04Cleaning
    Chemical clean where the pipe material and coolant programme require it.
  5. 05Filter replacement
    Change flush elements to service elements after cleanliness acceptance.
  6. 06Air removal
    Degassing and venting until stable dP and pump readings.
  7. 07Coolant fill
    Fill with the specified fluid via the fill cart, recording batch and volume.
  8. 08Coolant concentration test
    Verify glycol concentration and inhibitor level against datasheet.
  9. 09Water-quality test
    Conductivity, pH, hardness and particle count against the cold-plate spec.
  10. 10Pump rotation
    Direction, current draw and VFD parameter verification.
  11. 11Flow balancing
    Balance rows and racks against design flow per rack.
  12. 12Valve commissioning
    Stroke, authority, fail position and signal verification.
  13. 13Controls testing
    Sequence of operation, setpoints, alarms and failover.
  14. 14Leak detection test
    Simulate leak at rack and CDU; confirm alarm and isolation response.
  15. 15BMS integration
    Point-to-point verification of BACnet / Modbus objects.
  16. 16Thermal load test
    Load-bank or live-load verification of approach temperature and ΔT.

SYSTEM CLEANLINESS

  1. Initial flush
    Record flush velocity, duration and discharge condition.
  2. Filter changes
    Log every element change with differential pressure at change-out.
  3. Particle level
    Particle count against the cold-plate manufacturer limit.
  4. Water quality
    Conductivity, pH, chloride and hardness results.
  5. Coolant quality
    Concentration, inhibitor level and biological control.
  6. Final acceptance
    Cleanliness certificate issued before GPU load is applied.
New piping is never treated as clean. Cleanliness acceptance is required before GPU load is applied.

TCS SERVICE PROVIDERS

Piping contractor
Header and branch installation, joining, supports, testing.
Mechanical contractor
Plant room, CDU setting, pumps, heat rejection tie-in.
Liquid cooling installer
Manifolds, hoses, QDs and rack-level interface.
Controls integrator
BMS/EPMS integration, sequences, alarms, leak response.
Flushing contractor
Flushing, cleaning and cleanliness certification.
Water treatment provider
Chemistry programme, dosing and monitoring.
Commissioning agent
Cx plan, witnessing, documentation and handover.
Coolant supplier
Fluid supply, batch documentation and top-up.
Coolant testing laboratory
Periodic sample analysis and trend reporting.
Maintenance provider
Planned maintenance, filter service, leak response.

TCS PACKAGE COMMERCIAL MODEL

ALL TCS COMPONENT CATEGORIES

INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.