Caterpillar · Standby power
Caterpillar C175-20
Standby diesel generator set for data centre backup power.
Product versions / configurations
Region North AmericaVoltage NOT AVAILABLE IN CURRENT SOURCEFrequency NOT AVAILABLE IN CURRENT SOURCECertification UL, EPA Tier 2
Technical specifications
Standby rating3 MW
SOURCE Manufacturer website·OWNER Caterpillar·Caterpillar public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Voltage480 V / 13.8 kV options
SOURCE Manufacturer website·OWNER Caterpillar·Caterpillar public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Frequency60 Hz
SOURCE Manufacturer website·OWNER Caterpillar·Caterpillar public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
FuelDiesel
SOURCE Manufacturer website·OWNER Caterpillar·Caterpillar public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
EmissionsEPA Tier 2 / Stage V options
SOURCE Manufacturer website·OWNER Caterpillar·Caterpillar public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
FootprintNOT AVAILABLE IN CURRENT SOURCE
Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.
Documents
C175-20 brochure
Brochure · SOURCE Manufacturer website · OWNER Caterpillar · LAST UPDATED 2026-05
C175-20 technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER Caterpillar · LAST UPDATED 2026-03
Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.
Alternatives
Cummins — QSK953.5 MW · 44–70 weeks · North America, EMEA, APAC
Ranking reflects the selected project criterion only. No supplier is ranked as universally best.
Record summary
Category · Generator
Family · Standby power
Capacity · 3 MW
Lead time · 40–64 weeks
Regions · North America, EMEA, APAC
Factories · Lafayette, United States
Certifications · UL, EPA Tier 2
SOURCE Manufacturer website·OWNER Caterpillar·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C
NVIDIA ecosystem
NVIDIA DSX — AI factory infrastructure · LAST CHECKED August 2026 · LIKELY MATCH
NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.
Data completeness
Data completeness89%
- · Footprint — missing