Siemens Energy · Transformers

Siemens Energy GEAFOL 2500

Cast-resin distribution transformer for indoor electrical rooms and e-houses.

Demo data
SYSTEM · POWERCATEGORY · TRANSFORMERSUBCATEGORY · MEDIUM VOLTAGE TRANSFORMERPRODUCT TYPE · CAST-RESIN / OIL MV TRANSFORMERAPPLICATION · Data center power distributionCOMPARISON CLASS · TRANSFORMER

Product versions / configurations

Region EMEAVoltage 400 VFrequency 50 HzCertification CE, IEC

Technical specifications

Rated power2.5 MVA
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Primary voltage34.5 kV
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Secondary voltage400 V
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Frequency50 Hz
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
InsulationCast resin
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
EnclosureIP23 optional
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
WeightNOT AVAILABLE IN CURRENT SOURCE

Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.

Documents

GEAFOL 2500 brochure
Brochure · SOURCE Manufacturer website · OWNER Siemens Energy · LAST UPDATED 2026-05
PUBLIC
GEAFOL 2500 technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER Siemens Energy · LAST UPDATED 2026-03
REGISTERED

Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.

Alternatives

Mitsubishi ElectricDistribution transformer
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%REGIONAL REVIEW REQUIRED
NEEDS CONFIRMATION · Rated capacity · Supply voltage · Frequency · Regional compliance / availability in EMEACHECKED · Same functional category · Certification overlap: IEC

Candidates are filtered to the TRANSFORMER class first, then checked against capacity, voltage, frequency, certification and regional availability. Missing data is reported as needing confirmation — never as a pass and never as a failure.

Record summary

Category · Medium voltage transformer
Family · Transformers
Capacity · 2.5 MVA
Lead time · 36–52 weeks
Regions · EMEA, APAC, North America
Factories · Kirchheim, Germany
Certifications · IEC, CE
SOURCE Manufacturer website·OWNER Siemens Energy·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C

NVIDIA ecosystem

NVIDIA AI Factory infrastructure ecosystem · LAST CHECKED August 2026 · MANUAL REVIEW REQUIRED

NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.

Commercial — budgetary view

BUDGETARY ESTIMATEPRICE CONFIDENCE MEDIUMESTIMATE • TO BE CONFIRMED
$138K – $275K per unit
Currency USD · Region EMEA · As of Jul 2026 · EXW (assumed)Assumes Single unit, standard configurationIncludes Equipment only, Standard factory testExcludes Freight, Duty and tax, Installation, Commissioning, SparesBasis MV / power transformer market range per MVA. Budgetary estimate from 9 comparable current observations. No supplier quotation on record for this configuration.
Get firm quote

Availability & order

SUPPLIER CONFIRMATION REQUIRED

Order actions are requests, not purchases: price and availability require supplier confirmation before a PO is issued.

Schedule — factory to ready for service

ESTIMATED FACTORY LEAD TIMETO BE CONFIRMED
36–52 weeks · as of 2026-06
Factory manufacture + FAT3652 wks
Ship + customs24 wks
Site arrival to set in place12 wks
Installation24 wks
Commissioning23 wks
READY FOR SERVICE WINDOWJul 2027 – Dec 2027

Window assumes order placed today. Ready-for-service depends on site readiness and integration, not on factory lead time alone.

COMMISSIONING PRE-REQUISITES
  • · Foundation ready
  • · MV cabling complete
  • · Protection coordination issued

Known project references

No published project reference names this product yet. Where a source names only the manufacturer, the reference is recorded against the company instead.

Company relationships

MANUFACTURED BYSiemens EnergyCOMPANY
OFFICIALHIGH

Data completeness

PRODUCT DATA86%
SCHEDULE DATA100%
COMMERCIAL DATA33%
Data completeness90%
  • · Weight — missing
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.