Siemens Energy · Transformers

Siemens Energy GEAFOL 2500

Cast-resin distribution transformer for indoor electrical rooms and e-houses.

Demo data

Product versions / configurations

Region EMEAVoltage 400 VFrequency 50 HzCertification CE, IEC

Technical specifications

Rated power2.5 MVA
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Primary voltage34.5 kV
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Secondary voltage400 V
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Frequency50 Hz
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
InsulationCast resin
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
EnclosureIP23 optional
SOURCE Manufacturer website·OWNER Siemens Energy·Siemens Energy public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
WeightNOT AVAILABLE IN CURRENT SOURCE

Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.

Documents

GEAFOL 2500 brochure
Brochure · SOURCE Manufacturer website · OWNER Siemens Energy · LAST UPDATED 2026-05
PUBLIC
GEAFOL 2500 technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER Siemens Energy · LAST UPDATED 2026-03
REGISTERED

Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.

Alternatives

No comparable record in this category yet.

Ranking reflects the selected project criterion only. No supplier is ranked as universally best.

Record summary

Category · Medium voltage transformer
Family · Transformers
Capacity · 2.5 MVA
Lead time · 36–52 weeks
Regions · EMEA, APAC, North America
Factories · Kirchheim, Germany
Certifications · IEC, CE
SOURCE Manufacturer website·OWNER Siemens Energy·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C

NVIDIA ecosystem

NVIDIA AI Factory infrastructure ecosystem · LAST CHECKED August 2026 · MANUAL REVIEW REQUIRED

NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.

Data completeness

Data completeness90%
  • · Weight — missing