Vertiv · Racks

Vertiv VR / DCE high density

High density rack enclosure supporting liquid cooled AI platforms.

Demo data
SYSTEM · DATA HALLCATEGORY · IT SPACESUBCATEGORY · RACKPRODUCT TYPE · IT RACK / ENCLOSUREAPPLICATION · Data hall infrastructureCOMPARISON CLASS · RACK

Product versions / configurations

Region North AmericaVoltage NOT AVAILABLE IN CURRENT SOURCEFrequency NOT AVAILABLE IN CURRENT SOURCECertification UL

Technical specifications

Height48U / 52U
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Static loadUp to 1600 kg
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Width600 / 800 mm
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Depth1200 mm
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Liquid cooling readyYes
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B

Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.

Documents

VR / DCE high density brochure
Brochure · SOURCE Manufacturer website · OWNER Vertiv · LAST UPDATED 2026-05
PUBLIC
VR / DCE high density technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER Vertiv · LAST UPDATED 2026-03
REGISTERED

Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.

Alternatives

Schneider Electric / APCNetShelter SX
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%REGIONAL REVIEW REQUIRED
NEEDS CONFIRMATION · Rated capacity · Supply voltage · Frequency · Regional compliance / availability in North AmericaCHECKED · Same functional category · Certification overlap: UL
RittalVX IT
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%
NEEDS CONFIRMATION · Rated capacity · Supply voltage · Frequency · Certification equivalenceCHECKED · Same functional category · Available in North America
Chatsworth ProductsZetaFrame
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%
NEEDS CONFIRMATION · Rated capacity · Supply voltage · FrequencyCHECKED · Same functional category · Certification overlap: UL · Available in North America

Candidates are filtered to the RACK class first, then checked against capacity, voltage, frequency, certification and regional availability. Missing data is reported as needing confirmation — never as a pass and never as a failure.

Record summary

Category · Rack
Family · Racks
Capacity · NOT AVAILABLE IN CURRENT SOURCE
Lead time · 8–14 weeks
Regions · North America, EMEA, APAC
Factories · Westerville, United States
Certifications · UL
SOURCE Manufacturer website·OWNER Vertiv·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C

NVIDIA ecosystem

NVIDIA AI Factory infrastructure ecosystem · LAST CHECKED August 2026 · LIKELY MATCH

NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.

Commercial — budgetary view

BUDGETARY ESTIMATEPRICE CONFIDENCE MEDIUMESTIMATE • TO BE CONFIRMED
$1K – $4K per unit
Currency USD · Region North America · As of Jul 2026 · EXW (assumed)Assumes Single unit, standard configurationIncludes Equipment only, Standard factory testExcludes Freight, Duty and tax, Installation, Commissioning, SparesBasis Per IT rack / enclosure. Budgetary estimate from 6 comparable current observations. No supplier quotation on record for this configuration.
Get firm quote

Availability & order

SUPPLIER CONFIRMATION REQUIRED

Order actions are requests, not purchases: price and availability require supplier confirmation before a PO is issued.

Schedule — factory to ready for service

ESTIMATED FACTORY LEAD TIMETO BE CONFIRMED
8–14 weeks · as of 2026-06
Factory manufacture + FAT814 wks
Ship + customs24 wks
Site arrival to set in place12 wks
Installation24 wks
Commissioning24 wks
READY FOR SERVICE WINDOWJan 2027 – Apr 2027

Window assumes order placed today. Ready-for-service depends on site readiness and integration, not on factory lead time alone.

Known project references

No published project reference names this product yet. Where a source names only the manufacturer, the reference is recorded against the company instead.

Company relationships

MANUFACTURED BYVertivCOMPANY
OFFICIALHIGH

Data completeness

PRODUCT DATA100%
SCHEDULE DATA100%
COMMERCIAL DATA33%
Data completeness100%