Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Anthropic-Amazon New Carlisle

55001 Larrison Blvd, New Carlisle, IN 46552 · United States
IT power
910 MW
Compute
686k H100-eq
Capex
$34.5B
Owner
Amazon #confident
Programme
Project Rainier #confident
City
New Carlisle
Accelerators deployed
Trainium2
Buildings operational
32
Construction / EPC
NA
Energy partners
NA
Used by (companies)
Anthropic #confident
Latest deployment milestone · 2028-03-17

Buildings 19-32 are operational. This is an estimate based on how long Buildings 1-16 took to become operational. In May 2026, the foundation of several buildings and a substation was visible at the site of Buildings 19-32. Buildings 1-16 took 1 year and 10 months to go from a similar state to operational. So we add 1 year and 10 months to May 2026 to get this date estimate. The power capacity is based on an [air quality permit](https://t.co/HsAO7oyKa2) filed in May 2026, and the compute capacity is based on Trainium3 chips.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.