Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Colossus 2

5420 Tulane Rd, Memphis, TN 38109 · United States
IT power
946 MW
Compute
1112k H100-eq
Capex
$35.8B
Owner
SpaceXAI #confident
City
Memphis
Accelerators deployed
B200,B300
Buildings operational
3
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
Anthropic #confidentCursor #confidentSpaceXAI #confident
Latest deployment milestone · 2027-02-25

Building 3 is estimated to be completed. The site is predicted to have enough power infrastructure installed for a total of 1.5 GW of IT Power. Based on building plans we predict the addition of three more cooling arrays similar to the 6x24 dry coolers near Building 1 and 2. With the completion of current cooling structures and the addition of these arrays there will be ~540MW more cooling capacity for a full facility total of ~1390MW. If this cooling capacity is supplemented by mobile coolers, there would be enough cooling and power infrastructure to support 1.5 GW of IT power.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.