Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Crusoe Abilene Expansion

5502 Spinks Rd, Abilene, TX 79601 · United States
IT power
Compute
Capex
Owner
Microsoft #confident
City
Abilene
Buildings operational
2
Programme
NA
Accelerators deployed
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
Microsoft #likely
Latest deployment milestone · 2027-11-11

Building 2 operational. Based on the completion date to "build-out an office and data hall", stated in a [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008308).

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.