Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

DayOne Kempas

HP79+MP, 81300 Johor Bahru, Johor, Malaysia · Malaysia
IT power
422 MW
Compute
481k H100-eq
Capex
$16.0B
Owner
—
City
Johor
Country
Malaysia
Accelerators deployed
B300
Buildings operational
9
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
No public tenant disclosure
Latest deployment milestone · 2026-12-01

Buildings 7-8 assumed operational: roofed by Mar 2026, plus the default ~150-day roof-to-operational delay and ~3 months to ramp.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-11-08

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.