Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Goodnight

10001 Lima Rd, Claude, TX 79019 · United States
IT power
Compute
Capex
Owner
Google #speculative
City
Claude
Construction / EPC
CrusoeHoffman
Energy partners
Serena
Buildings operational
6
Programme
NA
Accelerators deployed
NA
Used by (companies)
Google DeepMind #speculative
Latest deployment milestone · 2027-10-01

6 buildings are operational. This is based on: 1. A [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026010861) for Building 6 with a completion date of 2027-07-30. Normally there is a follow-up filing for "tenant improvement" which involves building the interior, with a completion date 1-3 months after the initial filing. 2. A project deadline of EOY 2027 in the [original tax abatement agreement](https://www.co.armstrong.tx.us/upload/page/5361/Phase%201%20Tax%20Abatement%20Agreement%20-%20Signed.pdf) 3. The similar 8-building project in Abilene taking an estimated 2 yea

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.