Google Columbus

5076 S High St, Columbus, OH 43207 · United States
IT power
303 MW
Compute
332k H100-eq
Capex
$11.5B
Owner
Google #confident
City
Columbus
Accelerators deployed
TPU v5e,TPU v5p,TPU v6e,TPU v7
Buildings operational
5
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
Google DeepMind #speculative
Latest deployment milestone · 2027-07-01

Building 5 operational. The [transmission line construction notice](https://www.aeptransmission.com/ohio/docs/Hartman%20Farms%20Extension%20No.%202%20138%20kV%20Transmission%20Line%20Project%20Construction%20Notice.pdf) that expands site by 100 MW is assumed to be entirely for Building 5, and has an in-service date of July 1, 2027 (page 3). Estimate taken on the safe side based on completion times for Building 3-4 from when roof was complete.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.