Google Lincoln

5475 Cloud Ct, Lincoln, NE 68514 · United States
IT power
141 MW
Compute
198k H100-eq
Capex
$5.3B
Owner
Google #confident
City
Lincoln
Accelerators deployed
TPU v6e,TPU v7
Buildings operational
2
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
No public tenant disclosure
Latest deployment milestone · 2027-10-01

Building 2 operational. Estimated based on the construction timeline for Building 1, specifically the time to operational since the roof was complete and the time to operational since the foundation work began.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.