Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Google Storey County

Address not published · United States
IT power
161 MW
Compute
134k H100-eq
Capex
$6.1B
Owner
Google #confident
City
Accelerators deployed
TPU v5e,TPU v4,TPU v6e,TPU v5p
Buildings operational
3
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
Google DeepMind #speculative
Latest deployment milestone · 2027-06-30

Building 3 is estimated to be operational. We estimate the operational date by analogy to the time that Building 1 took to go from a foundation to being operational. The power capacity is based on the number of generators reported in an air quality permit [application](https://ndep-onbase.nv.gov/api/Document/AeFo%C3%89pjclbkomJ7CWpPryLOjA6FQT9HFrkSuMWbMXTpKCzSR%C3%81W1f8zzFhGhik1iZCcNSpuTRRqNXD1inrrpBxtA%3D/) (p.92-93). The dry cooler array is more than double the size of the Building 1 array, which suggests an even larger power capacity than we estimate, but we believe the generator-based est

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.