Huawei Wuhu
Wuhu, China · China
IT power
157 MW
Compute
76k H100-eq
Capex
$5.9B
- Owner
- Huawei #confident
- City
- Wuhu
- Country
- China
- Accelerators deployed
- Ascend 910C
- Buildings operational
- 8
- Programme
- NA
- Construction / EPC
- NA
- Energy partners
- NA
Used by (companies)
No public tenant disclosure
Latest deployment milestone · 2027-12-01
All eight AI buildings are operational. Buildings 3 and 9 are assumed to be 1.25x the power and compute of buildings 1 and 7 based on the sizing of the backup generator enclosures; building 8 is excluded due to insufficient cooling. The time from observed land-clearing to operational is 23-26 months based on previous buildings.
SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24
SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE
- · Equipment packages and suppliers — not published for this site
- · Cooling architecture and rack density — needs confirmation
- · MEP module provider — not known
- · Substation and interconnection detail — utility filing review required