Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Meta Gallatin

1 Meta Lp, Gallatin, TN 37066 · United States
IT power
87 MW
Compute
100k H100-eq
Capex
$3.3B
Owner
Meta #confident
City
Gallatin
Accelerators deployed
B300
Buildings operational
1
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
Meta #confident
Latest deployment milestone · 2026-08-24

Building 1 is operational, based on a lack of construction activity around the shell and cooling equipment, and about 6 months passing after structural completion.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-11-08

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.