Meta Hyperion
Holly Ridge, LA 71269 · United States
IT power
—
Compute
—
Capex
—
- Owner
- Meta #confident
- Programme
- Hyperion #confident
- City
- Holly Ridge
- Country
- United States
- Construction / EPC
- Mortenson
- Energy partners
- Entergy
- Buildings operational
- 9
- Accelerators deployed
- NA
Used by (companies)
Meta #confident
Latest deployment milestone · 2028-01-01
First phase is operational, based on a [Meta blog post](https://drive.google.com/file/d/1PmFNgOwkPepwjpGIbNUuPJP0LNgIqe7l/view?usp=sharing). We assume that this aligns with the three natural gas turbines being completed, for a total of 2262 MW capacity, but that these turbines have a backup role. This is close to the 1800 MW of load requested from the grid. Meta [claims](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/) that "The Hyperion cluster will have a 5-gigawatt capacity once complete", but so far there is no concrete evidenc
SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24
SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE
- · Equipment packages and suppliers — not published for this site
- · Cooling architecture and rack density — needs confirmation
- · MEP module provider — not known
- · Substation and interconnection detail — utility filing review required