Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Meta Kuna

601 Kuna Mora Rd, Kuna ID 83634 · United States
IT power
152 MW
Compute
173k H100-eq
Capex
$5.8B
Owner
Meta #confident
City
601 Kuna Mora Rd
Accelerators deployed
B300
Energy partners
Idaho Power Company
Buildings operational
2
Programme
NA
Construction / EPC
NA
Used by (companies)
Meta #confident
Latest deployment milestone · 2026-06-01

Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that "[Meta]’s load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,” A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.