Meta Montgomery

Co Rd 42, Montgomery, AL 36105, USA · United States
IT power
153 MW
Compute
175k H100-eq
Capex
$5.8B
Owner
Meta #confident
City
AL 36105
Accelerators deployed
B300
Construction / EPC
Hensel Phelps
Buildings operational
6
Programme
NA
Energy partners
NA
Used by (companies)
Meta #confident
Latest deployment milestone · 2027-02-23

Buildings 3 and 4 are operational (estimate). In September 2025, Building 1 and 2 appeared to be in a similar state to Building 3 and 4 in May 2026. Based on that, we apply an 8-month delay to the Building 1 and 2 operational date to get the Building 3 and 4 operational date.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.