Meta Prometheus

1 Community Cir, New Albany, OH 43054 · United States
IT power
496 MW
Compute
600k H100-eq
Capex
$18.8B
Owner
Meta #confident
Programme
Prometheus #confident
City
New Albany
Accelerators deployed
B200
Energy partners
WilliamsAmerican Electric Power
Buildings operational
27
Construction / EPC
NA
Used by (companies)
Meta #confident
Latest deployment milestone · 2028-07-01

Buildings 22-27 (3rd set of 6 Meta tents) are operational. This is a conservative estimate to align with the operability of the [Socrates the Younger](https://drive.google.com/file/d/1Gqu84nBqkyrrwMQy6nSiPykpyQsgLoao/view?usp=sharing) power plant. The power plant is operational by Q3 of 2028 based on the [project schedule](https://drive.google.com/file/d/1QaUa8QxoeLfxm3Dz0y-i0ByrIxgrpEAO/view?usp=sharing). It is announced to produce a maximum of 250MW.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required