Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Microsoft Fairwater Wisconsin

4800 90th St, Mount Pleasant, WI 53403 · United States
IT power
369 MW
Compute
446k H100-eq
Capex
$14.0B
Owner
Microsoft #confident
Programme
Microsoft AI WAN #confident
City
Mount Pleasant
Accelerators deployed
B200
Energy partners
WE Energies
Buildings operational
11
Construction / EPC
NA
Used by (companies)
OpenAI #likelyMicrosoft #likely
Latest deployment milestone · 2028-05-13

Buildings 3-11 are estimated to be operational. The grading for this revised 9-building plan was underway in May 2026, and we assume an average 2-year [build time](https://epoch.ai/data-insights/data-centers-buildout-speeds) from that point.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.