Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Microsoft SAT14

3545 Wiseman Boulevard, San Antonio, TX 78251 · United States
IT power
47 MW
Compute
45k H100-eq
Capex
$1.8B
Owner
Microsoft #confident
City
San Antonio
Accelerators deployed
H100,B300
Buildings operational
2
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
No public tenant disclosure
Latest deployment milestone · 2026-03-31

Building 2 fully operational, Building 1 expanded. Construction is already visibly complete. Additionally, construction phases [Phase 2](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471), [Phase 3](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588), and [Phase 4](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019686) on TDLR that collectively represent the completion of the site have a completion date of 2026-03-31.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.