Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

OpenAI Stargate Michigan

Address not published · United States
IT power
Compute
Capex
Owner
Oracle #confident
Programme
Stargate #confident
City
Buildings operational
3
Accelerators deployed
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
OpenAI #confident
Latest deployment milestone · 2028-12-31

Buildings 1-3 operational. Based on when maximum power load will be provided by DTE energy (Dec 2027), which can be extended by a year. [Source, page 3](https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001MH71XAAT)

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.