Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

OpenAI Stargate Shackelford

175 Private Road 1604, Abilene, TX 79601, Shackelford County · United States
IT power
Compute
Capex
Owner
Oracle #confident
Programme
Stargate #confident
City
TX 79601
Buildings operational
10
Accelerators deployed
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
OpenAI #confident
Latest deployment milestone · 2028-11-11

Building 10 is operational (estimate). TDLR lists the construction completion date for Building 10 as 2028-05-11. We add 6 months for commissioning, installation etc. before assuming the building is fully operational.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.