Intel Accelerator
INTEL ACCELERATOR
Verified project registry · refreshed daily

Start Campus Sines Data Campus

Start Campus - Sustainable Data Center Services, Sines, Portugal · Portugal
IT power
33 MW
Compute
32k H100-eq
Capex
$1.3B
Owner
Nscale #confident
City
Sines
Country
Portugal
Accelerators deployed
B300
Buildings operational
2
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
Microsoft #confident
Latest deployment milestone · 2027-09-30

Building 2 (SIN02) projected to be operational. This is based on the timeline provided in the [factsheet](https://23712035.hs-sites.com/hubfs/SINES_02.PDF.pdf?hsCtaAttrib=199407154715) for the site. We expect VR200 GPUs to be used as a lot of those chips will have already been available in September 2027, and the "up to 600kW racks" in the factsheet suggest they are aiming for this.

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-09-24

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.