YTL Johor

YTL Green Data Centers, Kulai, Johor, Malaysia · Malaysia
IT power
113 MW
Compute
154k H100-eq
Capex
$4.3B
Owner
—
City
Johor
Country
Malaysia
Accelerators deployed
B200,B300
Buildings operational
5
Programme
NA
Construction / EPC
NA
Energy partners
NA
Used by (companies)
No public tenant disclosure
Latest deployment milestone · 2028-08-01

Estimate: all five AI buildings operational. The mean time from first ground activity to operational across buildings 1 and 2 was 25.6 (25.1 and 26.0 months). Buildings 3 and 4 have been underway since Mar 2026, and building 5's plot only has construction equipment as of Jul 2026, so +25 months gives Aug 2028 as campus completion. Company guidance is faster: capacity "expected to double to 600MW by the end of 2027" per [Kenanga via The Star](https://www.thestar.com.my/business/business-news/2026/06/24/dc-expansion-to-lift-ytl-power); JDC4 phases Sep-25/Sep-26/Sep-27 per [MIDF](https://www.midf

SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-11-08

SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE

  • · Equipment packages and suppliers — not published for this site
  • · Cooling architecture and rack density — needs confirmation
  • · MEP module provider — not known
  • · Substation and interconnection detail — utility filing review required
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.