YTL Johor
YTL Green Data Centers, Kulai, Johor, Malaysia · Malaysia
IT power
113 MW
Compute
154k H100-eq
Capex
$4.3B
- Owner
- —
- City
- Johor
- Country
- Malaysia
- Accelerators deployed
- B200,B300
- Buildings operational
- 5
- Programme
- NA
- Construction / EPC
- NA
- Energy partners
- NA
Used by (companies)
No public tenant disclosure
Latest deployment milestone · 2028-08-01
Estimate: all five AI buildings operational. The mean time from first ground activity to operational across buildings 1 and 2 was 25.6 (25.1 and 26.0 months). Buildings 3 and 4 have been underway since Mar 2026, and building 5's plot only has construction equipment as of Jul 2026, so +25 months gives Aug 2028 as campus completion. Company guidance is faster: capacity "expected to double to 600MW by the end of 2027" per [Kenanga via The Star](https://www.thestar.com.my/business/business-news/2026/06/24/dc-expansion-to-lift-ytl-power); JDC4 phases Sep-25/Sep-26/Sep-27 per [MIDF](https://www.midf
SOURCE Epoch AI · AI Data Centers · LEVEL A · LAST VERIFIED 2026-11-08
SUPPLY-SIDE INTELLIGENCE GAPS FOR THIS SITE
- · Equipment packages and suppliers — not published for this site
- · Cooling architecture and rack density — needs confirmation
- · MEP module provider — not known
- · Substation and interconnection detail — utility filing review required