Intel Accelerator
INTEL ACCELERATOR
ABB · Medium voltage

ABB UniGear ZS1

Metal-clad medium voltage switchgear widely applied in data centre substations.

Demo data
SYSTEM · POWERCATEGORY · SWITCHGEARSUBCATEGORY · MEDIUM VOLTAGE SWITCHGEARPRODUCT TYPE · METAL-CLAD MV SWITCHGEARAPPLICATION · Data center power distributionCOMPARISON CLASS · MV SWITCHGEAR

Product versions / configurations

Region EMEAVoltage NOT AVAILABLE IN CURRENT SOURCEFrequency NOT AVAILABLE IN CURRENT SOURCECertification IEC

Technical specifications

Rated voltage24 kV
SOURCE Manufacturer website·OWNER ABB·ABB public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Rated current4000 A
SOURCE Manufacturer website·OWNER ABB·ABB public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Short-circuit withstand50 kA / 3 s
SOURCE Manufacturer website·OWNER ABB·ABB public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Arc classificationIAC AFLR
SOURCE Manufacturer website·OWNER ABB·ABB public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Frequency50/60 Hz
SOURCE Manufacturer website·OWNER ABB·ABB public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B

Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.

Documents

UniGear ZS1 brochure
Brochure · SOURCE Manufacturer website · OWNER ABB · LAST UPDATED 2026-05
PUBLIC
UniGear ZS1 technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER ABB · LAST UPDATED 2026-03
REGISTERED

Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.

Alternatives

Schneider ElectricPIX / SM AirSeT
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%
NEEDS CONFIRMATION · Rated capacity · Supply voltage · FrequencyCHECKED · Same functional category · Certification overlap: IEC · Available in EMEA
Siemens8DA/8DB
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%REGIONAL REVIEW REQUIRED
NEEDS CONFIRMATION · Rated capacity · Supply voltage · Frequency · Regional compliance / availability in EMEACHECKED · Same functional category · Certification overlap: IEC
EatonPower Xpert MV
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%
NEEDS CONFIRMATION · Rated capacity · Supply voltage · FrequencyCHECKED · Same functional category · Certification overlap: IEC · Available in EMEA

Candidates are filtered to the MV SWITCHGEAR class first, then checked against capacity, voltage, frequency, certification and regional availability. Missing data is reported as needing confirmation — never as a pass and never as a failure.

Record summary

Category · MV switchgear
Family · Medium voltage
Capacity · NOT AVAILABLE IN CURRENT SOURCE
Lead time · 36–56 weeks
Regions · EMEA, APAC, North America
Factories · Ratingen, Germany · Xiamen, China
Certifications · IEC
SOURCE Manufacturer website·OWNER ABB·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C

NVIDIA ecosystem

NVIDIA Partner Network · LAST CHECKED August 2026 · MANUAL REVIEW REQUIRED

NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.

Commercial — budgetary view

BUDGETARY ESTIMATEPRICE CONFIDENCE LOWESTIMATE • TO BE CONFIRMED
$45K – $95K per unit
Currency USD · Region EMEA · As of Jul 2026 · EXW (assumed)Assumes Single unit, standard configurationIncludes Equipment only, Standard factory testExcludes Freight, Duty and tax, Installation, Commissioning, SparesBasis Per MV switchgear cubicle, arc-resistant construction. Budgetary estimate from 5 comparable current observations. No supplier quotation on record for this configuration.
Get firm quote

Availability & order

SUPPLIER CONFIRMATION REQUIRED

Order actions are requests, not purchases: price and availability require supplier confirmation before a PO is issued.

Schedule — factory to ready for service

ESTIMATED FACTORY LEAD TIMETO BE CONFIRMED
36–56 weeks · as of 2026-06
Factory manufacture + FAT3656 wks
Ship + customs24 wks
Site arrival to set in place12 wks
Installation36 wks
Commissioning35 wks
READY FOR SERVICE WINDOWAug 2027 – Feb 2028

Window assumes order placed today. Ready-for-service depends on site readiness and integration, not on factory lead time alone.

COMMISSIONING PRE-REQUISITES
  • · Utility / generator source available
  • · Protection settings issued
  • · Cable terminations complete

Known project references

No published project reference names this product yet. Where a source names only the manufacturer, the reference is recorded against the company instead.

Company relationships

MANUFACTURED BYABBCOMPANY
OFFICIALHIGH

Data completeness

PRODUCT DATA100%
SCHEDULE DATA100%
COMMERCIAL DATA33%
Data completeness100%
INTEL ACCELERATOR. All figures shown are demo data for structural demonstration. Nothing is presented as verified market intelligence.