MEP modular provider · verified public data

ABB

Zurich, Switzerland · Public (SIX: ABBN) · NEURA classification APPROVED

E-houses, modular substations, MV/LV switchgear, power skids

Legal name
ABB Ltd
Founded
1988 (ASEA + BBC merger)
Parent company
Data not publicly available
Employees
~110,000 (company reported)
Primary industry
Electrification and automation
Maximum module MW
Data not publicly available
Maximum project MW
Data not publicly available
Current lead time
Data not publicly available
Verified production slot
Data not publicly available
Certifications
IEC, CE, UL (selected lines), ISO 9001
Headquarters country
Switzerland
Regions served
Europe, North America, APAC, Middle East

Module capabilities

Technical capability

Electrical
MV switchgear · LV switchgear · Transformer integration · Busway · Protection and control
Mechanical
Enclosure fabrication · HVAC for e-houses
Cooling
E-house cooling
Liquid cooling
Data not publicly available
Controls
PLC capability · Protection relays · EPMS integration
Delivery & commissioning
Factory pre-commissioning · FAT · SAT · On-site commissioning · Engineering

Countries of operation

Locations & factories (3)

FacilityTypeCountryProductsCapacityVerification
ZurichHeadquartersSwitzerlandCorporateData not publicly availablePUBLICLY VERIFIED
VaasaManufacturingFinlandDrives and electrification productsData not publicly availablePUBLICLY VERIFIED
BangaloreManufacturingIndiaE-houses and electrification packagesData not publicly availableSUPPLIER PUBLISHED

Past projects / reference projects

NO VERIFIED PUBLIC PROJECT REFERENCE FOUND — supplier confirmation or client permission required before a reference can be recorded.

Related signals

No monitored signal recorded for this company in the current window.

Data completeness

Data completeness59%
  • · Factory capacity — missing
  • · Liquid cooling capability — missing
  • · Maximum module MW — missing
  • · Maximum project MW — missing
  • · Current lead time — missing
  • · Verified production slot — missing
  • · Verified public project reference — missing

Intelligence gaps — what we still need to know

  • · Data centre specific e-house lead time — unknown
  • · UL listing scope by factory — needs technical confirmation
  • · Liquid cooling capability — not publicly claimed

Evidence

https://www.abb.comLevel B · last verified 2026-08-09MEDIUM

Alternatives & related suppliers