MEP modular provider · verified public data

Schneider Electric

Rueil-Malmaison, France · Public (Euronext: SU) · NEURA classification STRATEGIC PARTNER

Prefabricated modular data centre, power and cooling skids, e-houses

Legal name
Schneider Electric SE
Founded
1836
Parent company
Data not publicly available
Employees
~150,000 (company reported)
Primary industry
Energy management and automation
Maximum module MW
Data not publicly available
Maximum project MW
Data not publicly available
Current lead time
Data not publicly available
Verified production slot
Data not publicly available
Certifications
UL, CE, IEC, ISO 9001, ISO 14001
Headquarters country
France
Regions served
North America, Europe, APAC, Middle East, LATAM

Module capabilities

Technical capability

Electrical
MV switchgear · LV switchgear · Transformer integration · UPS integration · Busway · Generator integration · BESS integration
Mechanical
Chiller skids · Pump skids · Pipe racks · Mechanical plant rooms
Cooling
Chilled water · Air cooling · Liquid cooling readiness
Liquid cooling
Publicly marketed liquid-cooling reference designs and CDU partnerships
Controls
EcoStruxure BMS/EPMS · PLC capability
Delivery & commissioning
Design-for-manufacture · Off-site manufacturing · FAT · Commissioning services · Global service

Countries of operation

Locations & factories (4)

FacilityTypeCountryProductsCapacityVerification
Rueil-MalmaisonHeadquartersFranceCorporateData not publicly availablePUBLICLY VERIFIED
Andover, MassachusettsEngineeringUnited StatesData centre software and systemsData not publicly availablePUBLICLY VERIFIED
MonterreyManufacturingMexicoElectrical distribution equipmentData not publicly availableSUPPLIER PUBLISHED
BangaloreManufacturingIndiaPrefabricated modules and electrical equipmentData not publicly availableSUPPLIER PUBLISHED

Past projects / reference projects

NO VERIFIED PUBLIC PROJECT REFERENCE FOUND — supplier confirmation or client permission required before a reference can be recorded.

Related signals

No monitored signal recorded for this company in the current window.

Data completeness

Data completeness65%
  • · Factory capacity — missing
  • · Maximum module MW — missing
  • · Maximum project MW — missing
  • · Current lead time — missing
  • · Verified production slot — missing
  • · Verified public project reference — missing

Intelligence gaps — what we still need to know

  • · Prefab factory allocation for 2027 — unknown
  • · Lead time per module family — needs supplier confirmation
  • · Verified AI campus references — not captured yet