Schneider Electric · Critical power

Schneider Electric Galaxy VX

Large three-phase UPS for hyperscale and colocation power trains.

Demo data
SYSTEM · POWERCATEGORY · UPSSUBCATEGORY · STATIC UPSPRODUCT TYPE · DOUBLE-CONVERSION UPSAPPLICATION · Data center power conversionCOMPARISON CLASS · UPS

Product versions / configurations

Region North AmericaVoltage 480 VFrequency 60 HzCertification UL

Technical specifications

Rated power1.5 MW
SOURCE Manufacturer website·OWNER Schneider Electric·Schneider Electric public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Input voltage480 V
SOURCE Manufacturer website·OWNER Schneider Electric·Schneider Electric public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Frequency60 Hz
SOURCE Manufacturer website·OWNER Schneider Electric·Schneider Electric public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
TopologyDouble conversion
SOURCE Manufacturer website·OWNER Schneider Electric·Schneider Electric public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
EfficiencyUp to 97%
SOURCE Manufacturer website·OWNER Schneider Electric·Schneider Electric public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
CommunicationModbus, SNMP, BACnet
SOURCE Manufacturer website·OWNER Schneider Electric·Schneider Electric public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B

Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.

Documents

Galaxy VX brochure
Brochure · SOURCE Manufacturer website · OWNER Schneider Electric · LAST UPDATED 2026-05
PUBLIC
Galaxy VX technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER Schneider Electric · LAST UPDATED 2026-03
REGISTERED

Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.

Alternatives

Schneider ElectricGalaxy VL
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%
NEEDS CONFIRMATION · Rated capacity · Supply voltage · FrequencyCHECKED · Same functional category · Certification overlap: UL, CE · Available in North America
Eaton93PM
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%
NEEDS CONFIRMATION · Rated capacity · Supply voltage · FrequencyCHECKED · Same functional category · Certification overlap: UL, CE · Available in North America
VertivLiebert EXL S1
ENGINEERING REVIEW REQUIREDTECHNICAL MATCH 100%
NEEDS CONFIRMATION · Rated capacity · Supply voltage · FrequencyCHECKED · Same functional category · Certification overlap: UL, CE · Available in North America
VertivLiebert Trinergy Cube
NOT A VALID SUBSTITUTETECHNICAL MATCH 60%REGIONAL REVIEW REQUIRED
BLOCKING · Voltage 400 V · Frequency 50 HzNEEDS CONFIRMATION · Regional compliance / availability in North AmericaCHECKED · Same functional category · Capacity 3.4 MW — quantity recalculation required · Certification overlap: CE

Candidates are filtered to the UPS class first, then checked against capacity, voltage, frequency, certification and regional availability. Missing data is reported as needing confirmation — never as a pass and never as a failure.

Record summary

Category · UPS
Family · Critical power
Capacity · 1.5 MW
Lead time · 24–34 weeks
Regions · North America, EMEA, APAC
Factories · Barcelona, Spain · O'Fallon, United States
Certifications · UL, CE
SOURCE Manufacturer website·OWNER Schneider Electric·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C

NVIDIA ecosystem

NVIDIA AI Factory infrastructure ecosystem · LAST CHECKED August 2026 · LIKELY MATCH

NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.

Commercial — budgetary view

BUDGETARY ESTIMATEPRICE CONFIDENCE MEDIUMESTIMATE • TO BE CONFIRMED
$315K – $510K per unit
Currency USD · Region North America · As of Jul 2026 · EXW (assumed)Assumes Single unit, standard configurationIncludes Equipment only, Standard factory testExcludes Freight, Duty and tax, Installation, Commissioning, SparesBasis Double-conversion UPS market range per MW. Budgetary estimate from 7 comparable current observations. No supplier quotation on record for this configuration.
Get firm quote

Availability & order

SUPPLIER CONFIRMATION REQUIRED

Order actions are requests, not purchases: price and availability require supplier confirmation before a PO is issued.

Schedule — factory to ready for service

ESTIMATED FACTORY LEAD TIMETO BE CONFIRMED
24–34 weeks · as of 2026-06
Factory manufacture + FAT2434 wks
Ship + customs24 wks
Site arrival to set in place12 wks
Installation24 wks
Commissioning35 wks
READY FOR SERVICE WINDOWMay 2027 – Sep 2027

Window assumes order placed today. Ready-for-service depends on site readiness and integration, not on factory lead time alone.

COMMISSIONING PRE-REQUISITES
  • · Upstream power energised
  • · Switchgear commissioned
  • · Controls integrated
  • · Downstream distribution ready

Known project references

No published project reference names this product yet. Where a source names only the manufacturer, the reference is recorded against the company instead.

Company relationships

OFFICIALHIGH

Data completeness

PRODUCT DATA100%
SCHEDULE DATA100%
COMMERCIAL DATA33%
Data completeness100%