Vertiv · Critical power

Vertiv Liebert Trinergy Cube

Modular large-frame UPS for data centre critical power blocks.

Demo data

Product versions / configurations

Region EMEAVoltage 400 VFrequency 50 HzCertification CE

Technical specifications

Rated power3.4 MW
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Input voltage400 V
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Frequency50 Hz
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
TopologyModular, double conversion
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
EfficiencyUp to 98.1% (eco mode higher)
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
RedundancyN+1 module
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
CommunicationModbus, SNMP
SOURCE Manufacturer website·OWNER Vertiv·Vertiv public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B

Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.

Documents

Liebert Trinergy Cube brochure
Brochure · SOURCE Manufacturer website · OWNER Vertiv · LAST UPDATED 2026-05
PUBLIC
Liebert Trinergy Cube technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER Vertiv · LAST UPDATED 2026-03
REGISTERED

Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.

Alternatives

Schneider ElectricGalaxy VX1.5 MW · 24–34 weeks · North America, EMEA, APAC

Ranking reflects the selected project criterion only. No supplier is ranked as universally best.

Record summary

Category · UPS
Family · Critical power
Capacity · 3.4 MW
Lead time · 26–38 weeks
Regions · EMEA, APAC
Factories · Bologna, Italy
Certifications · CE, IEC
SOURCE Manufacturer website·OWNER Vertiv·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C

NVIDIA ecosystem

NVIDIA DSX — AI factory infrastructure · LAST CHECKED August 2026 · MANUAL REVIEW REQUIRED

NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.

Data completeness

Data completeness100%