MEP modular provider · verified public data
Anord Mardix
Kendal, Cumbria, United Kingdom · Subsidiary · NEURA classification QUALIFIED
Switchgear, PDUs, busway and prefabricated power modules for data centres
www.anordmardix.comMEDIUM
- Legal name
- Anord Mardix (a Flex company)
- Founded
- Data not publicly available
- Parent company
- Flex Ltd
- Employees
- Data not publicly available
- Primary industry
- Critical power distribution
- Maximum module MW
- Data not publicly available
- Maximum project MW
- Data not publicly available
- Current lead time
- Data not publicly available
- Verified production slot
- Data not publicly available
- Certifications
- UL, CE, IEC
- Headquarters country
- United Kingdom
- Regions served
- Europe, North America, APAC
Module capabilities
Technical capability
- Electrical
- MV switchgear · LV switchgear · Busway · PDU · Transformer integration · UPS integration
- Mechanical
- Enclosure fabrication
- Cooling
- Power module cooling
- Liquid cooling
- Data not publicly available
- Controls
- Power monitoring · EPMS integration
- Delivery & commissioning
- Factory pre-commissioning · FAT · SAT · On-site support
Countries of operation
Locations & factories (3)
| Facility | Type | Country | Products | Capacity | Verification |
|---|---|---|---|---|---|
| Kendal, Cumbria | Headquarters | United Kingdom | Corporate and manufacturing | Data not publicly available | PUBLICLY VERIFIED |
| Dundalk | Manufacturing | Ireland | Switchgear and power modules | Data not publicly available | SUPPLIER PUBLISHED |
| Chandler, Arizona | Manufacturing | United States | Critical power equipment and power modules | Data not publicly available | SUPPLIER PUBLISHED |
Past projects / reference projects
NO VERIFIED PUBLIC PROJECT REFERENCE FOUND — supplier confirmation or client permission required before a reference can be recorded.
Related signals
No monitored signal recorded for this company in the current window.
Data completeness
Data completeness47%
- · Founded — missing
- · Employee count — missing
- · Factory capacity — missing
- · Liquid cooling capability — missing
- · Maximum module MW — missing
- · Maximum project MW — missing
- · Current lead time — missing
- · Verified production slot — missing
- · Verified public project reference — missing
Intelligence gaps — what we still need to know
- · Employee count — unknown
- · Founded — unknown
- · Lead time and slot availability — needs supplier confirmation