Boyd · Liquid cooling

Boyd CDU-1300

In-row coolant distribution unit for direct liquid cooling loops.

Demo data

Product versions / configurations

Region North AmericaVoltage NOT AVAILABLE IN CURRENT SOURCEFrequency NOT AVAILABLE IN CURRENT SOURCECertification UL

Technical specifications

Cooling capacity1.3 MW
SOURCE Manufacturer website·OWNER Boyd·Boyd public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Heat exchanger typeBrazed plate
SOURCE Manufacturer website·OWNER Boyd·Boyd public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Pump redundancyN+1
SOURCE Manufacturer website·OWNER Boyd·Boyd public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Secondary coolantPG25
SOURCE Manufacturer website·OWNER Boyd·Boyd public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Leak detectionIntegrated
SOURCE Manufacturer website·OWNER Boyd·Boyd public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
BMS communicationModbus TCP
SOURCE Manufacturer website·OWNER Boyd·Boyd public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
DimensionsNOT AVAILABLE IN CURRENT SOURCE

Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.

Documents

CDU-1300 brochure
Brochure · SOURCE Manufacturer website · OWNER Boyd · LAST UPDATED 2026-05
PUBLIC
CDU-1300 technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER Boyd · LAST UPDATED 2026-03
REGISTERED

Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.

Alternatives

VertivXDU 13501.35 MW · 24–32 weeks · North America, EMEA, APAC
StulzCyberCool CDU1.2 MW · 22–30 weeks · EMEA, APAC
CoolIT SystemsCHx10001 MW · 16–24 weeks · North America, EMEA, APAC
MotivairMCDU 25002.5 MW · 20–28 weeks · North America, EMEA
VertivXDU 0700.07 MW · 12–18 weeks · North America, EMEA, APAC

Ranking reflects the selected project criterion only. No supplier is ranked as universally best.

Record summary

Category · Coolant distribution unit
Family · Liquid cooling
Capacity · 1.3 MW
Lead time · 18–26 weeks
Regions · North America, APAC
Factories · Portland, United States
Certifications · UL
SOURCE Manufacturer website·OWNER Boyd·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C

NVIDIA ecosystem

NVIDIA Partner Network · LAST CHECKED August 2026 · LIKELY MATCH

NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.

Data completeness

Data completeness90%
  • · Dimensions — missing