Stulz · Liquid cooling
Stulz CyberCool CDU
Liquid-to-liquid CDU for high density halls, EMEA-manufactured.
Product versions / configurations
Region EMEAVoltage NOT AVAILABLE IN CURRENT SOURCEFrequency NOT AVAILABLE IN CURRENT SOURCECertification CE
Technical specifications
Cooling capacity1.2 MW
SOURCE Manufacturer website·OWNER Stulz·Stulz public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Heat exchanger typePlate
SOURCE Manufacturer website·OWNER Stulz·Stulz public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Pump redundancyN+1
SOURCE Manufacturer website·OWNER Stulz·Stulz public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
Secondary coolantWater / PG
SOURCE Manufacturer website·OWNER Stulz·Stulz public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
BMS communicationModbus, BACnet
SOURCE Manufacturer website·OWNER Stulz·Stulz public product literature·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE B
DimensionsNOT AVAILABLE IN CURRENT SOURCE
Specifications are compiled from public manufacturer literature. Confirm against the configuration and revision applicable to your project before engineering use.
Documents
CyberCool CDU brochure
Brochure · SOURCE Manufacturer website · OWNER Stulz · LAST UPDATED 2026-05
CyberCool CDU technical datasheet
Technical datasheet · SOURCE Manufacturer website · OWNER Stulz · LAST UPDATED 2026-03
Documents above Public require sign-in or organization membership. Access is enforced per document, not per supplier profile.
Alternatives
Boyd — CDU-13001.3 MW · 18–26 weeks · North America, APAC
Vertiv — XDU 13501.35 MW · 24–32 weeks · North America, EMEA, APAC
CoolIT Systems — CHx10001 MW · 16–24 weeks · North America, EMEA, APAC
Vertiv — XDU 0700.07 MW · 12–18 weeks · North America, EMEA, APAC
Motivair — MCDU 25002.5 MW · 20–28 weeks · North America, EMEA
Ranking reflects the selected project criterion only. No supplier is ranked as universally best.
Record summary
Category · Coolant distribution unit
Family · Liquid cooling
Capacity · 1.2 MW
Lead time · 22–30 weeks
Regions · EMEA, APAC
Factories · Hamburg, Germany
Certifications · CE
SOURCE Manufacturer website·OWNER Stulz·Published lead-time guidance·LAST UPDATED 2026-06PUBLICDATA CONFIDENCE C
NVIDIA ecosystem
NO NVIDIA REFERENCE FOUND — this is not a technical judgement about the product.
NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.
Data completeness
Data completeness89%
- · Dimensions — missing