MEP modular provider · verified public data
Hitachi Energy
Zurich, Switzerland · Subsidiary · NEURA classification APPROVED
Transformers, modular substations, e-houses and grid connection packages
www.hitachienergy.comMEDIUM
- Legal name
- Hitachi Energy Ltd
- Founded
- 2020 (from ABB Power Grids)
- Parent company
- Hitachi, Ltd.
- Employees
- Data not publicly available
- Primary industry
- Power grid technology
- Maximum module MW
- Data not publicly available
- Maximum project MW
- Data not publicly available
- Current lead time
- Data not publicly available
- Verified production slot
- Data not publicly available
- Certifications
- IEC, CE, IEEE
- Headquarters country
- Switzerland
- Regions served
- Europe, North America, APAC, Middle East
Module capabilities
Technical capability
- Electrical
- Power transformers · MV switchgear · Protection and control · Grid connection
- Mechanical
- E-house fabrication
- Cooling
- Transformer cooling
- Liquid cooling
- Data not publicly available
- Controls
- Protection relays · SCADA
- Delivery & commissioning
- Engineering · FAT · Site commissioning
Countries of operation
Locations & factories (2)
| Facility | Type | Country | Products | Capacity | Verification |
|---|---|---|---|---|---|
| Zurich | Headquarters | Switzerland | Corporate | Data not publicly available | PUBLICLY VERIFIED |
| Ludvika | Manufacturing | Sweden | Power transformers and HVDC | Data not publicly available | PUBLICLY VERIFIED |
Past projects / reference projects
NO VERIFIED PUBLIC PROJECT REFERENCE FOUND — supplier confirmation or client permission required before a reference can be recorded.
Related signals
No monitored signal recorded for this company in the current window.
Data completeness
Data completeness53%
- · Employee count — missing
- · Factory capacity — missing
- · Liquid cooling capability — missing
- · Maximum module MW — missing
- · Maximum project MW — missing
- · Current lead time — missing
- · Verified production slot — missing
- · Verified public project reference — missing
Intelligence gaps — what we still need to know
- · Transformer slot availability — commercially sensitive, needs direct enquiry
- · Data centre e-house lead time — unknown