MEP modular provider · verified public data
Kirby Group Engineering
Limerick, Ireland · Private · Platform classification QUALIFIED
Data centre MEP delivery with off-site modular fabrication
www.kirbygroup.comMEDIUM
- Legal name
- Kirby Group Engineering
- Founded
- 1964
- Primary industry
- Mechanical and electrical engineering contracting
- Certifications
- ISO 9001, ISO 45001
- Headquarters country
- Ireland
- Regions served
- Europe
- Parent company
- NA
- Employees
- NA
- Maximum module MW
- NA
- Maximum project MW
- NA
- Current lead time
- NA
- Verified production slot
- NA
Module capabilities
Technical capability
- Electrical
- MV/LV installation · Switchgear installation · Substation works
- Mechanical
- Mechanical plant rooms · Pipe racks · Pump skids
- Cooling
- Chilled water systems
- Controls
- Controls installation
- Delivery & commissioning
- Off-site manufacturing · Installation · Commissioning · Engineering
- Liquid cooling
- NA
Countries of operation
NVIDIA ecosystem
NO NVIDIA REFERENCE FOUND for this company in the indexed public sources.
NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.
Brands & product marques
No brand architecture captured for this company yet.
Locations & factories (1)
Past projects / reference projects
NO VERIFIED PUBLIC PROJECT REFERENCE FOUND — supplier confirmation or client permission required before a reference can be recorded.
Related signals
No monitored signal recorded for this company in the current window.
Contact & catalogue
- Website
- www.kirbygroup.com
- Contact page
- Open enquiry form
- Online catalogue
- Product catalogue
- Phone
- NA
- NA
Data completeness
Data completeness47%
- · Employee count — missing
- · Manufacturing locations — missing
- · Factory capacity — missing
- · Liquid cooling capability — missing
- · Maximum module MW — missing
- · Maximum project MW — missing
- · Current lead time — missing
- · Verified production slot — missing
- · Verified public project reference — missing
Intelligence gaps — what we still need to know
- · Named client references — not published
- · Off-site fabrication capacity — unknown

