MEP modular provider · verified public data
Southland Industries
Dulles, Virginia, United States · Private · NEURA classification QUALIFIED
Mechanical MEP design-build with off-site prefabrication for mission critical
www.southlandind.comMEDIUM
- Legal name
- Southland Industries
- Founded
- 1949
- Parent company
- Data not publicly available
- Employees
- Data not publicly available
- Primary industry
- MEP building systems
- Maximum module MW
- Data not publicly available
- Maximum project MW
- Data not publicly available
- Current lead time
- Data not publicly available
- Verified production slot
- Data not publicly available
- Certifications
- ISO 9001
- Headquarters country
- United States
- Regions served
- North America
Module capabilities
Technical capability
- Electrical
- Coordination with electrical trades
- Mechanical
- Mechanical plant rooms · Pipe racks · Pump skids · Heat exchanger skids
- Cooling
- Chilled water systems · Cooling plant installation
- Liquid cooling
- Data not publicly available
- Controls
- BMS · Controls integration
- Delivery & commissioning
- Design-for-manufacture · Off-site prefabrication · Installation · Commissioning · BIM
Countries of operation
Locations & factories (1)
| Facility | Type | Country | Products | Capacity | Verification |
|---|---|---|---|---|---|
| Dulles, Virginia | Headquarters | United States | Corporate | Data not publicly available | PUBLICLY VERIFIED |
Past projects / reference projects
NO VERIFIED PUBLIC PROJECT REFERENCE FOUND — supplier confirmation or client permission required before a reference can be recorded.
Related signals
No monitored signal recorded for this company in the current window.
Data completeness
Data completeness47%
- · Employee count — missing
- · Manufacturing locations — missing
- · Factory capacity — missing
- · Liquid cooling capability — missing
- · Maximum module MW — missing
- · Maximum project MW — missing
- · Current lead time — missing
- · Verified production slot — missing
- · Verified public project reference — missing
Intelligence gaps — what we still need to know
- · Prefab shop capacity — unknown
- · Liquid cooling experience — needs confirmation