Modulus Infrastructure
Rotterdam, Netherlands · Prefabricated data center modules · QUALIFIED
Provider score
86
- Quoted lead time
- 38 weeks
- Actual delivered
- No delivery record
- Next production slot
- Q2 2027 (Dallas)
- Certifications
- UL 2755, CE, IEC 62271
- Technical
- 87/100
- Reliability
- 83/100
- Commercial
- 74/100
- Service
- 79/100
Equipment categories supplied
This is a demonstration record used to exercise the intelligence model. Verified provider dossiers live in MEP modular providers. Related categories: Modular data centersIntegrated power + cooling
NVIDIA ecosystem
NO NVIDIA REFERENCE FOUND for this company in the indexed public sources.
NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.
Brands & product marques
No brand architecture captured for this company yet.
Locations & factories (3)
| Facility | Type | Country | Products | Capacity | Verification |
|---|---|---|---|---|---|
| Rotterdam | Manufacturing | Netherlands | Modular data centers, Integrated power + cooling | NA | UNCONFIRMED |
| Dallas | Manufacturing | United States | Modular data centers, Integrated power + cooling | NA | UNCONFIRMED |
| Johor | Manufacturing | Malaysia | Modular data centers, Integrated power + cooling | NA | UNCONFIRMED |
Past projects / reference projects
| Project | Equipment | MW | Factory | Award | Stage | |
|---|---|---|---|---|---|---|
| Jurong Liquid-Cooled Node | 5 MW integrated block, DLC + rear-door hybrid | 20 | Johor, MY | 2026-06-29 | AWARDED | Open |
Related signals
No monitored signal recorded for this company in the current window.
Evidence
SOURCE Supplier submitted profileLEVEL D · Market intelligenceLAST VERIFIED 2026-06-19MEDIUM