MEP modular provider · verified public data

Rosendin

San Jose, California, United States · Employee owned (ESOP) · NEURA classification QUALIFIED

Data centre electrical construction with prefabrication facilities

Legal name
Rosendin Electric, Inc.
Founded
1919
Parent company
Data not publicly available
Employees
Data not publicly available
Primary industry
Electrical contracting
Maximum module MW
Data not publicly available
Maximum project MW
Data not publicly available
Current lead time
Data not publicly available
Verified production slot
Data not publicly available
Certifications
ISO 9001
Headquarters country
United States
Regions served
North America

Module capabilities

Technical capability

Electrical
MV/LV installation · Switchgear installation · Busway · Generator installation · UPS installation
Mechanical
Support steel · Skid fabrication
Cooling
Liquid cooling
Data not publicly available
Controls
Controls installation
Delivery & commissioning
Off-site prefabrication · Installation · Commissioning support · BIM

Countries of operation

Locations & factories (2)

FacilityTypeCountryProductsCapacityVerification
San Jose, CaliforniaHeadquartersUnited StatesCorporateData not publicly availablePUBLICLY VERIFIED
Sterling, VirginiaRegional officeUnited StatesData centre constructionData not publicly availableSUPPLIER PUBLISHED

Past projects / reference projects

NO VERIFIED PUBLIC PROJECT REFERENCE FOUND — supplier confirmation or client permission required before a reference can be recorded.

Related signals

No monitored signal recorded for this company in the current window.

Data completeness

Data completeness47%
  • · Employee count — missing
  • · Manufacturing locations — missing
  • · Factory capacity — missing
  • · Liquid cooling capability — missing
  • · Maximum module MW — missing
  • · Maximum project MW — missing
  • · Current lead time — missing
  • · Verified production slot — missing
  • · Verified public project reference — missing

Intelligence gaps — what we still need to know

  • · Prefab plant capacity — unknown
  • · Current bandwidth for new AI campuses — unknown

Evidence

https://www.rosendin.comLevel B · last verified 2026-08-09MEDIUM

Alternatives & related suppliers