Voltbank Energy Storage
Seoul, South Korea · BESS integrator · BACKUP
Provider score
73
- Quoted lead time
- 28 weeks
- Actual delivered
- No delivery record
- Next production slot
- Q2 2027 (Reno)
- Certifications
- UL 9540A, IEC 62619
- Technical
- 76/100
- Reliability
- 68/100
- Commercial
- 70/100
- Service
- 66/100
Equipment categories supplied
This is a demonstration record used to exercise the intelligence model. Verified provider dossiers live in MEP modular providers. Related categories: BESS modulesUPS
NVIDIA ecosystem
NO NVIDIA REFERENCE FOUND for this company in the indexed public sources.
NVIDIA references shown in Intel Accelerator are sourced from publicly available NVIDIA ecosystem information. Presence of an NVIDIA reference does not imply endorsement of Intel Accelerator, and Intel Accelerator is not affiliated with, sponsored by or certified by NVIDIA.
Brands & product marques
No brand architecture captured for this company yet.
Locations & factories (2)
| Facility | Type | Country | Products | Capacity | Verification |
|---|---|---|---|---|---|
| Ulsan | Manufacturing | South Korea | BESS modules, UPS | NA | UNCONFIRMED |
| Reno | Manufacturing | United States | BESS modules, UPS | NA | UNCONFIRMED |
Past projects / reference projects
| Project | Equipment | MW | Factory | Award | Stage | |
|---|---|---|---|---|---|---|
| Jurong Liquid-Cooled Node | 1.5 MW UPS modules, UL 9540A cells | 20 | Ulsan, KR | 2027-01-11 | Open |
Appears in reference BOM
- UPS module 1.5 MW — 24 · Power block (10 × 5 MW) · 28w · HIGH
Related signals
No monitored signal recorded for this company in the current window.
Evidence
SOURCE Conference discussionLEVEL D · Market intelligenceLAST VERIFIED 2026-03-02LOW